Items
|
Design States for Terminal I |
Levels |
4 above ground 1 underground |
Terminal Building |
169,500 square meters |
Height of Building (above ground) |
25.7 m |
Annual Passenger Flow |
12,000,000 pax |
Third Floor Departure Lobby |
48 immigration counters
2 departure security check points(collective security checks with one in the north end and one in the south end.
18 boarding gates
1 transit waiting room
4 remote boarding gates stations |
First Floor Departure Loungr |
10 check-in counters,240 windows
10 baggage check-in conveyers |
First Floor Arrivals Loungr |
1 Bureau of Tourism service counter
1 bus station
2 restaurants
1 telecom service counter |
North and South Departure Concourses |
21 waiting lounges 8 boarding gates |
North and South Arrival Concourses |
2 transit lounges |
Third Floor Arrival Lounges |
36 immigration counters
1 quarantine
1 immigration service counter
2 currency exchange service counters
Airport Poilce Division 2
4 duty free shops |
Baggage and Customs Hall, 1st floor |
6 baggage carousels
23 customs inspection stations |
Fourth Floor |
VIP rooms / restaurants |
Basemen |
Baggage handing area
(including arrivals and departures conveyer facilities) |
Parking Lots |
Total area: 95,537 square meters
Capacity: 2,310 vehicles |
Items |
Design States for Terminal II |
Levels |
4 above ground, 2 underground |
Terminal Building |
318,00 square meters |
Height of Building |
47.6 meters |
Annual Passenger Flow |
17,000,000 pax |
Peak Flow |
About 5,000 passengers per hour |
Third Floor Departures Lounge |
8 check-in counters
158 windows / 8 baggage conveyers
42 lanes for immigration counters
20 waiting and boarding gates
1 remote transit room / 6 remote transit gates |
Satellite Aprons(south) |
7 |
Second Floor Arrival Lounge |
58 immigration counters
1 transit wait room on the north and south sides |
First Floor
Arrivals baggage Lounge |
6 baggage conveyers (4 conveyers reserved)
34 lanes for baggages inspection counters |
First Floor Arrivals Lounge |
|
Fourth Floor |
VIP rooms / restaurants |
Basemen 1
|
Baggage handing area
(2 automated baggage inspection system) |
Basemen 2
|
Reserved to future MRT Station |
Parking Lot |
Total 212,916 square meters
capacity for cehicles:4,131 automobiles and 102 buses |
Traffic Airport Access |
To Outside the Airport: Buses, Taxi, Car Rentals. Within the Airport: Skytrain, under constructio |
MRT |
To link Downtown Taipei with Taoyuan International Airport (estimated date of completion, 2006). |
Skytrain (People Moving System)
|
Scheduled for completion before the end of June,2002 in both the controlled and non-controlled areas of TI and TII.
|